March 26, 2018 4:30pm Build time 12.5 Total time 18.5

VS Internals primed on Saturday after work, today riveted VS rear spar together. Those rivets in the lower hinge bracket are a royal PIA!

Half of the skin is riveted on (left open for tech inspection Wednesday morning at 830). Will finish up skin Wednesday afternoon after the inspection. Tomorrow moving on to HS. Looking forward to fabricating HS hold downs.