June 6 2018 – Build time 5 hrs, Total time 214.0
Inventory complete, I’m short a main hardware bag, a rib and aileron bracket. Not a huge deal, but can’t start building in the plan order. So I started with the rear spar and main spar prep.
June 7, 2018
Moved wing rack I constructed in to the shop so I can build both wings at the same time.