June 5, 2018 Build time 25.5 Total time 209.0
So it’s been kind of slow the past month, building wise. Most everything with the tail was done, except the fiberglass work. But with the Alaska trip in May (great time!) I used the remaining time waiting on the wing arrival to teach myself fiberglass work and install an AC unit for the shop. So the fiberglass work is done on the tail pieces. Yesterday wrapped up the rudder and elevator and took them to storage at the airport. Because today, the wing arrives!